Concrete Calculator

Measure your slab, pick a depth, and this gives you cubic metres, 20kg bag counts and a fair idea of the cost bagged versus delivered ready-mix. The aim is ordering exactly once.

Multiple slabs? Add up the areas, or run it once per slab.
ecoguide.au · concrete order
,
In 20kg bags, bags
Bagged, hardware shop,
Bagged + mixer hire (DIY),
Ready-mix, delivered,

Rates: 2026–27 reference offers · updated July 2026

How we work it out

Length × width × depth gives cubic metres, the same sum as mulch or decking, just with a much heavier material. The judgment call is depth. 75 mm suits a path or garden edge, 100 mm is standard for a shed slab or patio, and driveways want 125–150 mm depending on whether it's carrying a car or something heavier. Skimp on depth to save a few bags and you're setting yourself up for cracking.

Worked example: a 4 m × 3 m shed slab at 100 mm needs 1.2 m³. That's 130 bags of 20 kg premix, roughly $1,170 to $1,560 at the hardware shop, or about $380 to $480 delivered by a ready-mix truck. Past around half a cube, ready-mix nearly always wins.

Bagged or ready-mix?

Bagged premix suits small jobs: footings, post holes, a garden edge, anything under about half a cubic metre. Beyond that, mixing by hand or barrow becomes a full day's labour for a result a truck delivers already blended in one pour. Ready-mix suppliers apply a short-load surcharge under roughly a cubic metre, so a driveway or shed slab is usually the point where it's worth calling one.

Don't forget the mixer

The bagged total above is materials only. Past a handful of bags, mixing by hand in a wheelbarrow is slow going, and most people hire a mixer instead. A small electric cement mixer runs about $45 to $65 for the first day at an independent hire yard: Bendigo Smart Hire lists its electric mixer at $60 for a full day, and Geoffs Hire prices its small and large electric mixers at $45 and $55. A bigger pour, past about half a cubic metre in one go, realistically needs the mixer for more than a single day, and extra days cost less than the first: Central Hire Echuca's own rate card runs $45 for day one, $80 for two, and about $35 more for every day after that. Geoffs Hire's weekly rate ($220 for its small electric mixer, against $45 a day) works out cheaper again once a job runs past about five days. The "Bagged + mixer hire" line above scales with the job's own size using this same day-then-week structure, instead of adding one flat day's rate no matter how much there is to mix.

Common questions

How many 20kg bags of concrete make a cubic metre?

108, per Boral's own product data sheet for General Purpose Concrete Mix. A calculator that rounds this to 100 is using a convenient number, not the manufacturer's actual yield figure.

How deep should a concrete slab be?

75 mm for a path or edging, 100 mm for a shed floor or patio, and 125–150 mm for a driveway, more at the top end if trucks or heavy vehicles will cross it.

Is ready-mix concrete cheaper than bags?

Per cubic metre, yes, substantially: bagged premix works out at roughly $850 to $1,300 a cube once you're buying 100-plus bags, against about $320 to $400 delivered by truck. The catch is most suppliers charge a minimum-order or short-load fee under about a cubic metre, which is why bags still make sense for small jobs.

Do I need to hire a mixer for a DIY concrete job?

Past a handful of bags, yes, mixing by hand in a wheelbarrow is too slow to keep pace with the concrete setting. A small electric cement mixer runs about $45 to $65 for the first day at an independent hire yard, worth adding to the bagged total above rather than treating the bags as the whole cost. A pour past about half a cubic metre often needs it for longer than one day; extra days cost roughly $30 to $40 more each, cheaper again by the week once a job runs past about five days.

How long before you can drive on new concrete?

About 7 days for a light vehicle, driven and parked gently, per CCAA's own published curing data, which is only around two-thirds of the concrete's 28-day design strength. Save anything heavier, a loaded trailer, caravan or truck, for the full 28 days. Walking on it only needs 24 to 48 hours. See our full curing timeline guide for the day-by-day breakdown.

Sources

Electricity rates: AER Default Market Offer (NSW, SA, south-east QLD), Victorian Default Offer, and each remaining state's regulated tariff, current for 2026–27. Appliance figures: the energyrating.gov.au registration database (July 2026 snapshot). Methods and assumptions are described on each page.

See how it compares

Real appliances ranked by running cost, on the same registry data and state electricity rates.

Browse the comparisons →